Programming: Paul, Julia, Samir, Malav, Bailey, Nitant, David

* Line follower sensors - If I recall correctly, FIRST will provide for us the line follower code. However, they seem to have not posted the 2011 technical resources yet. Be on the lookout
* Dashboard/GUI - Imagine two 3x3 grids, where each section of a grid corresponds to a post in the same position. Then, our driver can just push a button and the arm will automatically go to that position on the grid. With our knowledge of labview so far, it should be entirely possible to create a dashboard that simulates this grid.

Minibot: Kat, Vikram, Deepan, Scott, Andrew

Discussion/Brainstorming

With the last team update, any idea of using potential energy to launch our minibot is out the window. Unfortunately, we must now do things the legitimate way. We already have a Tetrix kit in the back our storage room. It's currently in the form of an already assembled robot. Dismantle it first and then get to work. It would be nice to have a basic brainstormed idea along with some prototypes by the end of Saturday.

Chassis/Manipulator/Intake: Everybody else/TBD

Chassis/Drivetrain Discussion/Brainstorming

Intake Discussion/Brainstorming

We already have a very nice CADed design for our chassis this year. We will be making precise measurements and cuts based off of the specifications of the CAD. On Saturday, teams of you will measure the 80/20 pieces. The marked pieces will be handed to Mr. Dallas or Mr. Fred, (or any other parent volunteer that has experience with power tools) and will then be cut. These cut pieces will then be assembled with gussets, screws, and plates also according to the specifications of the CAD.

The intake mechanism has also been CADed up. However, it has not been tested yet and will need some prototyping. This team of people will try to determine the optimum position of the intake rollers, etc.

The lifting mechanism is the only part we have not entirely designed or thought of yet. So far, our strongest competitor has been a winch driven telescoping lift. I will try to lead a team in brainstorming and prototyping this lift.
ptwortman wrote: ...you make a double graph comparing Logan's hair and frustration levels.
Sunny
Alumni
Posts: 1309
Joined: June 3rd, 2009, 8:36 pm
Team Position: Mechanical

Re: NEXT MEETING INFORMATION! 1/15/11

Post by Sunny »

Logan wrote:The lifting mechanism is the only part we have not entirely designed or thought of yet. So far, our strongest competitor has been a winch driven telescoping lift. I will try to lead a team in brainstorming and prototyping this lift.


There are some preliminary CADs posted in the lifter thread. There some nice/important suggestions and dimensions in that thread that might be of some help.
Paul
Secretary
Posts: 217
Joined: September 17th, 2010, 11:46 pm
Team Position: Toaster

Re: NEXT MEETING INFORMATION! 1/15/11

Post by Paul »

Are we coming to school on Saturday?

Also, I'll make some carbon copies of the LabVIEW if anyone needs to install the new program. It takes over an hour to install the environment, so it'll expedite our process...
User avatar
Logan
President
Posts: 76
Joined: June 3rd, 2009, 9:49 pm
Team Position: HeadScrewTightenerAndHeadCheerleaderAndVP

Re: NEXT MEETING INFORMATION! 1/15/11

Post by Logan »

Weather permitting, as far as I know, we are meeting on Saturday.

Thanks for the CADs, Sunny.

Sill trying to think of a deployment method though of the lifter... will try to get on that
ptwortman wrote: ...you make a double graph comparing Logan's hair and frustration levels.
Sunny
Alumni
Posts: 1309
Joined: June 3rd, 2009, 8:36 pm
Team Position: Mechanical

Re: NEXT MEETING INFORMATION! 1/15/11

Post by Sunny »

Logan wrote:Sill trying to think of a deployment method though... will try to get on that


Deployment of the lifter or of the minibot?
User avatar
Logan
President
Posts: 76
Joined: June 3rd, 2009, 9:49 pm
Team Position: HeadScrewTightenerAndHeadCheerleaderAndVP

Re: NEXT MEETING INFORMATION! 1/15/11

Post by Logan »

Of the lifter, sorry. Edited original post.

I know we are talking about using a piston to hold it up, but I don't know how we can get the intake roller to deploy and reach out past the bumper zone.
ptwortman wrote: ...you make a double graph comparing Logan's hair and frustration levels.
User avatar
Malav Ghia
Team Member
Posts: 67
Joined: July 14th, 2009, 3:58 am
Team Position: Veteran
Contact:

Re: NEXT MEETING INFORMATION! 1/15/11

Post by Malav Ghia »

Also,

What are our plans to calarborate with 1771 (North Gwinnett), if at all?
M.K.G
User avatar
Rikhil
Team Member
Posts: 28
Joined: October 28th, 2010, 6:59 pm
Team Position: Member

Re: NEXT MEETING INFORMATION! 1/15/11

Post by Rikhil »

@Paul even if i am not on the programming team and i allowed to have labview on my computer?
Paul
Secretary
Posts: 217
Joined: September 17th, 2010, 11:46 pm
Team Position: Toaster

Re: NEXT MEETING INFORMATION! 1/15/11

Post by Paul »

Rikhil wrote:@Paul even if i am not on the programming team and i allowed to have labview on my computer?

Yes. All members will have access to the team's repository of toolkits.
Nitant
Team Member
Posts: 136
Joined: October 31st, 2010, 12:09 pm
Team Position: Programmer with Internet Expertise
Location: in Mrs. Rutland's room annoying her
Contact:

Re: NEXT MEETING INFORMATION! 1/15/11

Post by Nitant »

I believe I'm supposed to be on the programming team, although I'm fine either way.
Nitant wrote:Darnit, guys, I'm a programmer, not a SQA engineer.